In Penza assembly of Father Frost's house half finished
Print
Penza, 28 November 2017. PenzaNews. Installation of Father Frost's log house, which started in Lenin square on Monday, November 27, is half finished.
© PenzaNewsBuy the photo
Workers made walls of the log hut 2.5 metres high.
According to estimates of a PenzaNews correspondent, over 40 rough-hewn logs were required for the three blind walls.
The contours of the future house are already visible. The part that overlooks the main New Year tree in Penza will be open – with a wide entrance and a kind of a veranda.
In the near future, builders will start installation of the roof. Decorative windows with carved platbands will be placed there.
The installation is carried out fast enough thanks to the fact that the wooden building is prefabricated. All logs and parts were prepared and numbered in advance.
As it was reported before, in addition to Father Frost's house the single New Year complex will also include wooden facilities built and decorated in a single style that will be used for a thematic fair.
It is expected that during certain hours Father Frost will communicate with residents and guests of Penza.